DESCARGAR PDF
Chlorine Gas Ejector
Model: O’ring ejector 100, 250 y 500 PPD

In gas dispensing systems through vacuum, one of the critical points of the system is the ejector, since it is in charge of generating the vacuum and it is where the water to be treated and the gas meet. Any failure in the ejector provokes major disruptions in the gas dispensing system, which may even end up filled with water. Capital Controls ejectors provide great adaptability to the different pressure and flow conditions, besides being very efficient at the moment of generating vacuum. Through its seal by means of O’rings they ensure an airtight seal preventing the passage of water including in waters loaded with sand and other strange elements, they may be used with sewage waters.

DESIGN
Sealing through a rigid seal, with no diaphragm.
Extra large passage diameter.
Manufactured in a plastic material with great resistance to shocks.
THIS ENSURES THAT
• Thanks to its sealing system it prevents water from backing up through the gas line, preventing unnecessary maintenance.
• Due to kits sealing system and the internal passage of the ejector, it may be used in sewage water systems as well as drinking water.
• Great maintenance simplicity, allowing quick interventions.
• Efficient venture system enabling adaptability and low power consumption for its operation.
• Long time duration due to its manufacture in high shock resistant plastic.
CAPACITY AND SERVICE
MATERIALS
Body : High impact resistance ABS plastic
Bolts and support : Stainless steel
DIMENSIONS
OPERATION CURVES
TYPICAL INSTALLATION