Water Treatment Plant and pressurizing Systems Molyb Filial Codelco

Client: Molyb
Delivery Date: October 2015
Location: Mejillones

•Details engineering, the revision and approval was done with Amec Foster Wheeler being administrator agent for the contract. The supply contemplated the engineering under Codelco standards of potable water and emergency showers pressurizing systems for the whole complex and the water treatment of raw water from a re mineralization process.

•The plant is completely compact and containerized giving the seal of our robust engineering, completely automatic requiring only a check round because the functioning and visualization of the process is shown on the control room.

•The plant works under pressure and flow switch present in the entries, and they send signals to the terrain PLC which also controls the residual chlorine dosing for maintaining the effluent under norm.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or