Study phase of the project
•Development of basic engineering and engineering details for a series of improvements to the existing treatment plant of industrial waste in CODELCO Division Ventanas.
•The proposed works are those that relate to the first stage of treatment by reverse osmosis intended for TDS concentration and obtaining water treated with the quality needed to be incorporated into the process water in Codelco Ventanas.
Working Flow: 56 m3/h

RELATED PROJECTS