Technical Support in the Commissioning of the Sewage Treatment Plant (PTAR I, II, III)

Client: Odebrecht
Delevery Date: Julio 2013
Location: Tocumén, Panamá

Commissionnig phase

•Advice and technical support to the commissioning of the plant through the definition of strategies: planning, identification of processes and equipment, test definition, issuing of manuals and staff training.

Study phase of the project

•Development of conceptual basic engineering of the project through the necessary calculations and studies both conceptually as budget and support in the preparation of technical and commercial proposal.
•Thorough and detailed review of the executive project of the firm Suez Environment-Degremont, with the aim of expanding the plant.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 