Sewage Water Treatment Plant Parroquia Quitumbe, Distrito Metropolitano de Quito

Client: ESEICO S.A.
Delivery Date: July 2015
Location: Quito – Ecuador

•Detail Engineering for disassembly and mounting, integral equipment Manufacturing, mounting and start-up technical assistance for the following equipments:

•Scrapping Bridges for rectangular sand remover tanks;

•Circular Scrapping Bridges D=35 m;

•Circular Scrapping Bridges D=10 m;

•Fine grids with automatic cleaning system of 3.800 mm. length and 1000 mm. width

•Rough grids with automatic cleaning system of 3.800 mm. length and 1000 mm. width

•Automation and Control Systems, PLC programming operation protocols, electric ducts.

•Tests and Start-up: of the implemented system along with the execution of programming the whole system for its optimal operation.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or