The feature of this project is the height of installation with the presence of snow and the speed with which the assembly was performed.
This Project includes:
•Design.
•Equipment supply.
•Implementation and control of electrical equipment.
•Mounting on site and commissioning of the sewage treatment plant Potrerillos.
Working flow: 280 m3/day
![](http://eathisa.com/wp-content/uploads/2018/03/Sewage-Treatment-Plant-Potrerillos-1.jpg)
RELATED PROJECTS