Reverse Osmosis Plant Camp 2.3

Client: Minera Escondida
Delivery Date: December 2012
Location: Antofagasta, Chile

•This project consists of an RO system with an output of 35 m3/h.
•It was requested once the camp 5400 became operational
•Maintenance of equipment was reduced by chemical washes every 8 months.

The Project included:

•Supply
•Testing
•Commissioning


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 