•This project consists of an RO system with an output of 35 m3/h.
•It was requested once the camp 5400 became operational
•Maintenance of equipment was reduced by chemical washes every 8 months.
The Project included:
•Supply
•Testing
•Commissioning

RELATED PROJECTS