Potable Water Plant Potrerillos

Client: Codelco División Salvador
Delivery Date: May 2016
Location: El Salvador III Región, Chile

•As a totally compact and sturdy supply, the details and construction engineering of a potable water plant is included. Its technology includes automation and integration of multilayered filters and reverse osmosis processes.

•For a flow of 5 l/s the complete operation is under logic of automated control for both the Osmosis system and the measurement of the required parameters for the operation.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or