Mineral concentrate shipping terminal

Client: Odebrecht
Delivery Date: May 2014
Location: Lima, Perú

Development of detailed engineering, supply of MT and LV equipment, control and electrical assemblies (SCADA), And commissioning for the shipment terminal of mineral concentrates of TRANSPORTADORA CALLAO S.A.C.

This is broken down into:

•Design, Supply, Installation and Commissioning: Fully equipped electric rooms.
•Power supply.
•Lighting system.
•Fire detection system in the Electrical Rooms and of the area called VOPAK of the Tubular Belt.
•Control and communication data transmission system.
•CCTV Closed Circuit System for the operational zones of the project.
•Control room.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or