•Project of supply and installation of filter systems for the reduction of Iron and Manganese.
•Treatment system allows obtaining potable water free of Iron and Manganese.
The treatment system has two stages:
•Filters with media TURBIMAX
•Filters with media OMNISORB, design capacity 3,7 l/s

RELATED PROJECTS