Project stages
•Concept engineering development.
•Details engineering development.
•Supply of LIW Treatment Plant to meet the Maximum Allowable Values (MAV) of the waste non-domestic water discharge in the sanitary sewage system D.S. N° 021-2009-VIVIENDA.
•It is possible to operate the system with an average flow of 10 m3/h and 30m3/h as maximum flow.
•Electrical and mechanical installations.
•Start-up
•System operation
The project consists in treating water from a food plant with a great amount of fats, BOD and a very variable composition in the inlet water quality.
![](http://eathisa.com/wp-content/uploads/2018/05/LIW-Treatment-Plant-Fresh-Products-Development-PTR-CEPF.jpg)
RELATED PROJECTS