Filter system extension 100 microns

Client: Mining Esperanza – Antofagasta Minerals
Delivery Date: December 2013
Location: Mejillones, Chile

•Detailed Engineering: Each node equipment, includes operating protocols, PLC programming, beam-pipes external electrical power, interior grids and cameras
•Supplies: materials and equipment according to requisition documents of materials and equipment issued by the engineering details.
•Assemble: Valves and equipment, power piping and wiring, control and instrumentation. Installation of switchgears and control.
•Rehabilitation of existing valves.
•Testing and Commissioning: Implemented system linked with performing programming of the entire system for the optimal performance.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or