Expansion System of electrochlorination Plant in dockside concentrate and Seawater Uptake of Esperanza Pier

Client: Antofagasta Minerals
Delivery Date: September 2014
Location: Mejillones, Chile

•Uptake and impulsion of seawater, requires a primary step of organic waste removing, based on seawat er chlorination.

•We carried out the design and supply of a new system to increase the electrochlorination capacity from 200-360 kilos of equivalent to increased 2 to 3.6 m3 da on hypochlorite at 10% where our engineering had the virtue of adapt the existing electrochlorination with minimal impact on the facility.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or