The Project is part of the expansion of Rajo Sur Mine in shaping the civic district.
•Project implemented under a contract in the form of Turnkey or EPC and Testing and Commissioning.
The system consists of 4 areas:
• Water Treatment Plant
• Sewage Treatment Plant
• Wastewater Treatment Plant
• General Area of Interconnection between these Plants and the buildings of the Civic District
• Operation and maintenance of Plants
• Operation and Transfer March 2015
Project under FAST TRACK mode