Engineering, supply and installation of Instrumentation and equipment for automatization for the Hydraulic Ring Nodes of the Potable Water Project Group 2

Client: Odebrecht
Delivery Date: May 2015
Location: Panama City, Panama

Details Engineering, supply and installation of:

•Electric actuators
•Ultrasonic flowmeters
•Insertion flowmeters
•Tank level and Pressure sensors
•Residual Chlorine Meters
•Electric panels and PLCs

Start-up and control system integration.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or