Study phase of the project
•From the preliminary design, consulting is done on both the specifications of the pipes and more hydraulic elements for the establishment of strategies.
•identification of processes, materials and equipment, definition and design of testing and protocols.
Study phase of procurement
•Search, identification and evaluation of the manufacturers of the necessary elements such as: Pipes, fittings, valves and other equipment required for the project.
•Development of procurement of such items and the controls necessary to delivery at the ports of Panama.

RELATED PROJECTS