Engineering for Power Increase from 400 Mw to 500 Mw for Third Transmission Line in Veladero Panama

Mandante: Odebrecht
Fecha Entrega: June 2014
Lugar: Veladero, Panama

Development of Technical and Economical Viability Study for a Basic Design for 500 MVA, including the new amounts of all works and search of technical solutions differentiated for the elaboration of the study that lead to more power contemplating updated technologies.


FASES DE INGENIERÍA:
  • Ingeniería conceptual
  • Ingeniería básica
  • Diseño
  • Procurement
  • Montaje y obras
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Servicios Operación
  • Servicios Mantenimiento
  • Transferencia

 