Engineering detail, supply and installation of materials and equipment necessary for the system automation nodes included in Addendum I Drinking Water Project Group 2

Client: Odebrecht-IDAAM
Delivery Date: May 2015
Location: City of Panama, Panama

•Detailed Engineering: Each node equipment, includes operating protocols, PLC programming, beam-pipes external electrical power, interior grids and cameras

•Supplies: materials and equipment according to requisition documents of materials and equipment issued by the engineering details.

•Assemble: Valves and equipment, power piping and wiring, control and instrumentation. Installation of switchgears and control. Rehabilitation of existing valves.

•Testing and Commissioning: Implemented system linked with performing programming of the entire system for the optimal performance


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 