Design, supply, installation and commissioning of extension in Sewage Treatment Plant El Noviciado industry

Client: Inv. e Inmob. Lomas de Hidronor
Delivery Date: May 2014
Location: Santiago, Chile

•Increase of existing capacity to double is projected It is considered a biological reactor by aeration with high load, with treatment capacity of 115m3/d

•An integrated and compact design is applied for the units of degradation, decantation, and chlorination.

•An automatic control system is integrated for regulating the discharge of hypochlorite dosing and monitoring blowers towards the efficient use of energy.

Project under FAST TRACK mode


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or