COI-II Engineering for Design and Construction Project of Final Conduction Works of Waste Water from Panama City and Interceptor System Client: Odebrecht Delivery Date: December 2014 Location: Panama City, Panama •Value Engineering for the Procurement and Works for the Project. •Manuals and Procedures Elaboration. Engineering Phases: Prefeasibility Feasibility Desing Procurement Construction & Installation Pre-comissioning Comissioning Start-up Operation Service Maintenance Service Transfer RELATED PROJECTS ¿INTERESTED IN THIS OR OTHER PROJECTS? Send an email to empresa@eathisa.com or Contact Us