COI-II Engineering for Design and Construction Project of Final Conduction Works of Waste Water from Panama City and Interceptor System

Client: Odebrecht
Delivery Date: December 2014
Location: Panama City, Panama

•Value Engineering for the Procurement and Works for the Project.

•Manuals and Procedures Elaboration.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS

¿INTERESTED IN THIS OR OTHER PROJECTS?
Send an email to empresa@eathisa.com or