•Automation of a section of the macro distribution network in Lima.
•The system consists of pipes of 1400 mm. in diameter; pressure controlling stations; regulation tanks 30,000 m3. and a sectorization valve assembly.
•Comprehensive engineering management of the solution is performed.
•Commissioning of a 100% automated operation of the whole assembly and interconnection with centralized control system SCADA.