Collahuasi Wasted Water Treatment Plant Functioning Improvement

Client: Minera Collahuasi
Delivery Date: January 2012
Location: Iquique, Chile

•A general improvement of the Industrial Liquid Wastes plant from the concentrator of the copper mine was made.
•Two existing circular DAF that were out of service were put into operation.
•The osmosis plant was modified so that it could work with the 3 stages of the original design.
•A pretreatment model was done on an empiric form, the chemical cleaning processes were defined both for the osmosis and for the system ultrafiltration.
•Finally, all the system was automated using the existent PLC.


Engineering Phases:
  • Prefeasibility
  • Feasibility
  • Desing
  • Procurement
  • Construction & Installation
  • Pre-comissioning
  • Comissioning
  • Start-up
  • Operation Service
  • Maintenance Service
  • Transfer

 

RELATED PROJECTS